Product Development

Making Innovation Work

7C believes that the ocean can provide us with all the green and sustainable resources we need. 


7C is committed to convert knowledge into innovative offshore solutions to meet ocean development.

PyraWind: Floating Offshore Wind Solution

Proven semi-submersible technology

Low steel weight per MW installed

Scalable Brace-less Modular Structure

Support Mass Production

Excellent Stability Performance

Easy Transport and Installation

PyraWind Concept

The patented floating wind foundation concept PyraWind provides a scalable, integrated wind turbine solution that minimizes the LCOE of offshore wind applications. 


The pyramid-shaped hull provides a stable, solid foundation for the large wind turbine under development. The platform includes 3 columns canted inward from the corner of the hull toward the central vertical axis. Horizontally disposed pontoons interconnect adjacent columns at the lower ends. The columns and pontoons form a closed, brace-less structure hull to support the turbine tower directly above the top of the column convergence point. 

The convergence of canted columns providing strong support to the center tower has an advantage in keeping the tower's natural frequency within the desired range. This unique feature reduces the effective length of the tower and gives a higher stiffness to the tower. Therefore, it allows the use of a lightweight tower. The structure load transfer from the turbine tower to 3 columns is natural and effectively utilizes the whole structure capacity.


The overall structure weight is reduced due to more efficient structure configuration, and the platform is hydrostatically stable with wind turbines installed at the quayside. This design avoids the need for offshore integration of wind turbines and hulls at offshore sites.

Quayside Integration

Wet Tow to Installation Site

Wet Tow to Installation Site

  • Shallow Water Port Accessible
  • Assemble the wind turbines in one piece and perform grid connection test onshore
  • Load the wind turbine onto the substructure hull via a heavy-duty conveyor or crane

Wet Tow to Installation Site

Wet Tow to Installation Site

Wet Tow to Installation Site

Decent stability during transportation

Install Mooring System

State-of-the-Art Analysis

State-of-the-Art Analysis

 Hookup pre-laid mooring lines on site 

State-of-the-Art Analysis

State-of-the-Art Analysis

State-of-the-Art Analysis

Structural, Global Performance, and Mooring Analysis 

Numerical Simulation

ANSYS AQWA

OpenFast

Publication: OMAE 2021-62640

PyraWind: An Innovative Floating Offshore Wind Turbine (FOWT) Global Performance Analysis

OMAE2021-62640_Rev5 (pdf)Download